102 YINSON HOLDINGS BERHAD SECTION 05 : OUR CAPITALS MANUFACTURED CAPITAL Our operating assets at the Bhadla Solar Park were acquired during the course of FYE 2021 and were only consolidated following completion of the second phase of the acquisition in December 2020. The operational performance since initial acquisition is illustrated in the chart below and demonstrates strong and stable performance, with budgeted generation exceeded over the year. OFFSHORE MARINE DIVISION t :JOTPO T 047T BDIJFWFE BO BWFSBHF VUJMJTBUJPO SBUF PG JO ':& ESPQQJOH GSPN ':& T VUJMJTBUJPO SBUF PG 92.69%. The drop in utilisation was a result of lower demand due to the slowdown in offshore activities and movement restrictions arising from the Covid-19 pandemic. t %VSJOH UIF MPX TFBTPO XF PSHBOJTFE GPS WFTTFM VQHSBEFT BOE PWFSIBVMT BOE DFSUJmDBUJPO QSPDFTTFT UP CF DBSSJFE PVU 'PS example, in Q3 FYE 2021, Yinson Hermes underwent a 19-day drydock and engine overhaul and received bollard pull certification. t /P OFX BTTFUT XFSF BDRVJSFE JO ':& Yinson Hermes 59.2% PTSC Huong Giang 48.0% PTSC Lam Kinh 100.0% Yinson Perwira 100.0% Actual Generation P50 Forecast Accumulated Actual Generation Accumulated P50 Forecast 30.0 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 300 250 200 150 100 50 - 27.0 24.0 21.0 18.0 15.0 12.0 9.0 6.0 3.0 - MONTHLY AND ACCUMULATED NET POWER GENERATION (GWh) OFFSHORE MARINE FLEET UTILISATION *100% basis, site meter.

RkJQdWJsaXNoZXIy NDgzMzc=