Yinson Annual Report 2023

195 NOTES TO THE FINANCIAL STATEMENTS (CONT’D) For the financial year ended 31 January 2023 ACCOUNTABILITY (FINANCIAL STATEMENTS) 2. Summary of significant accounting policies (continued) 2.6 Fair value measurement (continued) The senior management, in conjunction with the Group’s external valuers, also compares the changes in the fair value of each asset and liability with relevant external sources to determine whether the change is reasonable. For the purpose of fair value disclosures, the Group has determined classes of assets and liabilities on the basis of the nature, characteristics and risks of the asset or liability and the level of the fair value hierarchy as explained above. 2.7 Revenue from contracts with customers The Group and the Company recognise revenue to depict the transfer of promised goods or services to the customer in an amount that reflects the consideration to which the entity expects to be entitled in exchange for those goods or services. Revenue is recognised when a customer obtains control of goods or services, i.e. when the customer has the ability to direct the use of and obtain the benefits from the goods or services. A five-step process is applied before revenue can be recognised: Step 1: Identify contracts with customers; Step 2: Identify the separate performance obligations; Step 3: Determine the transaction price of the contract; Step 4: Allocate the transaction price to each of the separate performance obligations; and Step 5: Recognise the revenue as each performance obligation is satisfied. The specific recognition criteria described below must also be met before revenue is recognised. (i) Engineering, Procurement, Construction, Installation and Commissioning (“EPCIC”) of Floating Production, Storage and Offloading (“FPSO”) vessels The Group provides design, supply, installation, operation, life extension and demobilisation of FPSO vessels. The vessel is constructed and leased to a customer on a finance lease arrangement (EPCIC contracts). The vessel is operated by the Group, under a separate operating and maintenance agreement, after transfer to the customer. The contract includes multiple deliverables (such as Front-End Engineering Design (“FEED”), engineering, construction, procurement, installation, maintenance, operating services, demobilisation). The Group assesses the level of integration between different deliverables and ability of the deliverables to be performed by another party. Based on this assessment, the Group concludes whether the multiple deliverables are a single, or separate, performance obligation(s). The EPCIC contract generally comprise a single performance obligation due to significant integration of the activities involved. The Group determines the transaction price based on consideration stated in the EPCIC contract and transaction price is allocated to performance obligations in the contract based on the relative stand-alone selling prices. The EPCIC contract has agreed fixed pricing terms and a fixed lump sum.

RkJQdWJsaXNoZXIy NDgzMzc=