Wah Seong Corporation Berhad Annual Report 2022

OCTOBER 30 October Wasco Coatings Middle East QFZ LLC, and indirect subsidiary of WSC had achieved 1,000,000 manhours without a Lost Time Incident. NOVEMBER 21 November MISB was awarded an EPCC job to supply, install, and integrate a 90-tonnes-per-hour gas-fired boiler into the existing process system of the largest sugar refinery plant in Malaysia. Once commissioned, the boiler will have one of the largest capacities among sugar refinery boilers in the region for its application. 23 November 3QFY2022 Results Announcement. DECEMBER 1 December Wasco Engineering Group Limited, an indirect whollyowned subsidiary of WSC completed the acquisitions of the fabrication facilities with an upgraded load out capability of receiving ocean going vessels in Batam, Indonesia. 5 December PTWEI celebrated exceptional safety performance with cumulative 30 million LTI free man-hours in Batam, Indonesia. 7 December WSEF was awarded the US$127,089,115 (equivalent to RM557,654,328) contract by Yinson Azalea Production Pte. Ltd. for the supply of certain FPSO topside modules. 21 December Wasco Pipeline services completed the Timi Project with 114,918 man-hours without LTI and was nominated for Shell Malaysia Safety Awards 2022. Wasco Coatings UK Ltd, an indirect wholly-owned subsidiary of WSC had successfully completed the Porthos CCS Project for Gasunie in the Netherlands. The project is of notable importance as the first significant CCS project in North West Europe and cements Wasco’s place as a one stop shop for anti-corrosion, insulation and concrete weight coating in Europe/UK. 31 December Wasco Pipeline services completed the Barossa Gas Export Pipeline. CORPORATE CALENDAR Annual Report 2022 Wah Seong Corporation Berhad 09

RkJQdWJsaXNoZXIy NDgzMzc=