UEM EDGENTA BERHAD ANNUAL REPORT 2021 1 2 3 4 5 6 7 MANAGEMENT DISCUSSION & ANALYSIS 83 82 Total Electricity Consumption (kWh) at Menara UEM, 25 UEM Edgenta’s site offices and EMSB operations FY2019 5,426,113 FY2020* 4,296,632 FY2021* 4,644,581 FY2018 5,382,667 Scope 1 emissions (fuel) (tonnes CO₂) FY2019 8,238.34 FY2020 5,711.16 FY2021 5,387.54 FY2018 8,281.45 Scope 1 (fuel - petrol & diesel) emissions intensity (tonnes CO₂ employee) FY2019 1.82 FY2020 1.32 FY2021 0.86 FY2018 1.91 Total Fuel (petrol) Consumption (litres) FY2019 1,385,382.75 FY2020 861,051.17 FY2021 741,073.89 FY2018 1,388,909.50 Total Energy (petrol) Consumption (GJ) FY2019 48,502.25 FY2020 30,145.40 FY2021 24,945.00 FY2018 48,625.72 Total Fuel (diesel) Consumption (litres) FY2019 41,791,126.36 FY2020 1,330,443.66 FY2021 1,318,651.62 FY2018 1,803,822.12 Total Energy (diesel) Consumption (GJ) FY2019 68,779.25 FY2020 51,089.04 FY2021 50,636.22 FY2018 69,266.77 Total Scope 2 (electricity) emissions (tonnes CO₂) FY2019 3,765.52 FY2020* 4,652.81 FY2021 4,886.44 FY2018 3,735.57 Scope 3 (water consumption) emission (Mt CO₂): FY2019 1,516.99 FY2020 2,416 FY2021 1,781.93 FY2018 1,309.91 Scope 3 - category 6 (air travel) emissions (Mt CO₂) FY2019 473.67 FY2020 94.75 FY2021 156.53 FY2018 235.84 Scope 3 (air travel) emissions intensity (Mt CO₂/employee) FY2019 0.1046 FY2020 0.0220 FY2021 0.0224 FY2018 0.0545 Material After a year of trials, the pilot programme with the Taiping Municipal Council to recycle asphalt pavement, was a resounding success. The result was a total of 612.5 tonnes of milling waste which has been reused as recycled asphalt pavement. This has led to the development of a plant to produce recycled asphalt pavement on a commercial scale. Operations of this plant is scheduled to start in the fourth quarter of 2022. We have invested RM700k in R&D for recycled asphalt project during its pilot phase. Healthcare Support Division The Group’s Healthcare Support division manages waste generated by the Ministry of Health. The waste stream generated includes chemical waste, clinical waste, heavy metal waste, EEEW (electrical & electronic equipment waste) and kitchen waste. Total Waste Managed (tonnes) FY2019 5,347.96 FY2020 5,484.58 FY2021 7,315.51 Total Waste Directed to Disposal FY2019 4,592.56 FY2020 4,820.44 FY2021 6,566.20 Hazardous Waste (tonnes) FY2019 81.4 FY2020 75.14 FY2021 76.31 Non-hazardous Waste (tonnes) Total Waste Diverted from Disposal FY2019 674 FY2020 589 FY2021 673 Hazardous Waste (tonnes) SUSTAINABILITY STATEMENT SUSTAINABILITY STATEMENT Waste Every sector faces challenges in managing waste, our solution helps them navigate their waste disposal while ensuring minimal disruptions to their operations. Infrastructure Services Division Scheduled waste generated from the Infrastructure Services division includes fluorescent lamps, waste oil, contaminated containers and filters, and E-waste. The division has been actively involved in seeking solutions for operational efficiencies in waste management. Initiatives include miling waste generated from pavement rehabilitation projects used in recycled asphalt production and waste generated from Rest and Layby areas to be recycled and quantified. Furthermore, infrastructure waste haulers will be assessed for their compliance to ESG policies from FY2022 onwards. Regional Breakdown of Schedule Waste Generated by Infrastructure Services (MT) 4.4 Northern Region 3.4 Southern Region 2.6 Central Region Total Schedule Waste Generated: 10.5 Total Paper Consumption of UEM Edgenta Group (No. of A4 reams used): FY2018 5,497 FY2019 8,062 FY2020 14,898 FY2021 21,353 ENVIRONMENTAL MANAGEMENT Note: * Reinstated
RkJQdWJsaXNoZXIy NDgzMzc=