Wasco Berhad Integrated Annual Report 2025

110 WASCO BERHAD SECTION 4 SUSTAINABILITY JOURNEY Cumulative On-Site Solar Capacity Growth (kWp) Capacity: 2,261.8 kWp Generation: 1,166 MWh Avoided: 896 tCO2e Growth: +4% vs 2024 Sites: • WAT, Selangor • WPE, Selangor (Expansion) • WAPL, Queensland • WCM, Pahang Capacity: 878.5 kWp Generation: 1,120 MWh Avoided: 859 tCO2e Growth: +60% vs 2023 Sites: • WAT, Selangor • WPE, Selangor • WAPL, Queensland Capacity: 878.5 kWp Generation: 699 MWh Avoided: 537 tCO2e Growth: +9% vs 2022 Sites: • WAT, Selangor • WPE, Selangor • WAPL, Queensland Capacity: 498.5 kWp Generation: 640 MWh Avoided: 495 tCO2e Growth: +First site Sites: • WAT, Selangor (First) Foundation Optimisation 2025 2024 2023 2022 Record High Expansion Renewable energy generation and Scope 2 emissions avoided across Wasco Group (2022–2025) ~3.6 MWh Total Renewable Electricity Generated ~2.26 MWp Total Installed Solar Capacity +82% Generation Growth 2022 – 2025 ~2,787 tCO2e Total Emissions Avoided Electricity Generated This expansion is a direct result of our commitment to achieving our short-term Net-Zero target and our medium-term goal of having renewable energy comprise 40% of our energy mix by 2035. It is a tangible demonstration of our strategy in action. Solar Capacity Growth (kWp) 2022 2023 2024 2025 498.5 878.5 878.5 2,261.8 Capacity (kWp) 2,500 2,000 1,500 1,000 500 0 SUSTAINABILITY JOURNEY

RkJQdWJsaXNoZXIy NDgzMzc=