Wah Seong Corporation Berhad Annual Report 2018

23 August Wasco Asset Integrity Solutions with Deepwater Corrosion Services completed the installation of Subsea Pipeline Cathodic Protection Retrofit Project for the provision of design, manufacture, supply and installation of subsea protection systems. 7 September Incorporation of PMT Saito Sdn. Bhd., a joint venture company between PMT Industries Sdn. Bhd., an indirect wholly-owned subsidiary of WSC and Saito Separator Limited. 15 November Wasco (Australia) Pty Ltd, an indirect subsidiary of WSC commenced construction work on the Senex Roma Nort Project for the construction of modular gas processing facility. 21 November PT. Wasco Engineering Indonesia, an indirect subsidiary of WSC was awarded US$1.0mil (equivalent to RM3.91mil) contract by Schneider Electric Systems (formerly known as Invensys) to supply 5 Blast Field Auxiliary Room (FAR) for Brunei LNG. 27 November 3QFY2018 Results Announcement. 7 December Wasco Coatings Malaysia Sdn. Bhd., an indirect subsidiary of WSC took its final load out of 1,839 units of 18 meters coated pipes for BP Oman Khazzan Project from Kuantan Port to Muscat, Oman. 10 December Wasco Lindung Sdn. Bhd., an indirect subsidiary of WSC loaded out Retropod & Retrosled for 24 inch ERP-KNM pipeline and ERP Platform Project from Kuantan yard to SAP yard at Songkhla, Thailand. 18 December Wasco (Australia) Pty Ltd, an indirect subsidiary of WSC completed and handed over Field Boost Compressors project and the Plant 3 LTS & Compression project to Central Petroleum Brisbane at the Mereenie Gas Plant. 22 January 18 December 17 August 14 August 15 May ANNUAL REPORT 2018 9

RkJQdWJsaXNoZXIy NDgzMzc=